• Features
  • Case Studies
  • Pricing
  • Login

How Team Collaboration Tools in eRS Power Visibility, Efficiency, and On-Site Alignment at John Holland

Team Working

John Holland is one of Australia’s leading engineering, contracting, and services providers, delivering large-scale projects in rail, building, transport, and energy. With operations spanning multiple industries and sites, the company’s biggest challenge has always been coordination. Projects demand the right mix of engineers, contractors, and equipment, but traditional tools often lead to overlaps, underutilised resources, and delayed timelines.

To streamline this complexity, John Holland turned to a resource management software built to simplify planning across people and assets. The goal wasn’t just visibility—it was smarter allocation, fewer clashes, and smoother collaboration between teams in the field and decision-makers at headquarters. By combining intuitive scheduling with powerful team collaboration tools, John Holland found a way to keep its projects running on track without drowning in administrative overhead.

When Equipment, Crews, and Deadlines Collide

At John Holland, no two projects look the same. One week it’s a rail corridor upgrade, the next a new energy facility or a high-rise in Sydney’s CBD. What they all have in common is scale and complexity—specialist crews, subcontractors, and heavy equipment that can’t be in two places at once.

Relying on scattered spreadsheets and siloed updates meant that project managers and site supervisors often operated in isolation. A crane might be scheduled for two sites on the same day. An engineer critical to one deadline might still be tied up on another. Even minor delays—caused by weather, site access, or subcontractor changes—could snowball across other projects.

The result was a constant balancing act: keeping resources aligned without full visibility, keeping projects moving without complete confidence. Without a centralised resource management software to orchestrate these moving parts, John Holland faced the very real risk of slippage, budget overruns, and reputational exposure on projects worth millions.

From Guesswork to Smarter Scheduling

What John Holland needed was more than a digital calendar. They needed a way to see every engineer, contractor, and piece of equipment in one place and know exactly where they were committed. That’s where the Scheduling module in eRS made the difference.

With the power of a true resource scheduling software, project managers could instantly allocate crews and assets to the right jobs, adjusting plans on the fly when timelines shifted. No more double-booked cranes, no more engineers stretched thin across overlapping deadlines. Every resource could be assigned with precision, and changes were visible to all stakeholders in real time.

The platform also brought in a level of foresight. Instead of reacting to conflicts as they happened, teams could spot gaps and clashes early—whether it was a shortfall in skilled workers or a piece of equipment tied up longer than expected. Scheduling became less about firefighting and more about strategic planning.

But the real breakthrough came from its team collaboration tools. On-site supervisors and head office finally worked from the same live schedules. Updates flowed instantly between the field and the boardroom, eliminating delays caused by miscommunication and ensuring everyone stayed aligned. For leadership, it meant confidence that every project had the right resources lined up, backed by data instead of assumptions.

Beyond Scheduling: Collaboration That Actually Works

While scheduling solved the immediate challenge of allocating people and equipment, the bigger shift for John Holland came in how teams worked together. Construction projects aren’t run in isolation—site crews, subcontractors, planners, and executives all need to be in sync. That’s where eRS’s team collaboration tools made a tangible difference.

Instead of chasing updates through endless emails or siloed reports, everyone worked from the same system. Site supervisors could flag changes instantly, project managers could reassign resources in seconds, and leadership could track progress without waiting for weekly catch-ups. The result wasn’t just smoother workflows—it was a cultural shift from fragmented communication to real collaboration.

The platform also bridged the gap between office and field. Crews on the ground had access to the same live information as decision-makers, reducing the lag between identifying a problem and finding a solution. For leadership, it meant more than smoother workflows—it offered foresight for future capacity planning, ensuring resources were not just aligned for today but ready for the projects to come.

By pairing strong scheduling with effective collaboration, John Holland gained something that spreadsheets and siloed tools could never deliver: clarity across every layer of the organisation.

What Changed for John Holland

For John Holland, the introduction of eRS turned project delivery from a guessing game into a coordinated system. Instead of juggling scattered updates and siloed schedules, teams finally had a single source of truth for people, equipment, and timelines.

The Scheduling module made double bookings a thing of the past, but the impact reached further. Rail upgrades, energy facilities, and large-scale builds could now be sequenced with precision, reducing idle downtime and ensuring critical resources were where they needed to be. On-site crews and head office planners operated in sync, with adjustments reflected instantly across the organisation.

By using eRS as a resource management software, John Holland not only streamlined scheduling but also unlocked greater accountability and foresight. Projects ran with fewer surprises, deadlines became more reliable, and leadership could commit with confidence, knowing the infrastructure they delivered would hold to plan.

Why It Matters

For John Holland, the adoption of eRS wasn’t just about better scheduling, it was about reshaping how projects were delivered at scale. By pairing smart allocation with powerful team collaboration tools, the company reduced the risk of resource clashes, gained real-time visibility, and brought consistency to even the most complex projects.

In an industry where delays translate directly into financial penalties and reputational risks, having a platform that aligns people, equipment, and leadership is a strategic advantage. With eRS, John Holland proved that large-scale infrastructure projects don’t have to be defined by uncertainty—they can run with precision, accountability, and confidence.

Building Smarter, Not Harder

For John Holland, the decision to adopt eRS was about more than just fixing scheduling headaches. It was about future-proofing how complex engineering projects are delivered. With a single platform bringing together scheduling precision and team collaboration tools, the company turned fragmented processes into a streamlined system.

The outcome is clear: fewer clashes, stronger accountability, and projects that move with confidence from plan to delivery. In an industry where one delay can ripple across entire communities, having the right resource management software isn’t optional—it’s essential.

John Holland’s story shows that when resources, people, and equipment align, even the most ambitious infrastructure projects can run to time, to budget, and to expectation.

Disclaimer: This case study has been prepared by our product specialists based on our understanding of the client’s usage of eResource Scheduler. While every effort has been made to ensure accuracy, we do not claim that this case study reflects 100% of the client’s issues, actual processes, or results.

Plan Smarter. Schedule Faster. For Free.

Join thousands already using eResource Scheduler to align teams, time, and tasks—seamlessly.

No setup delay | No payment required | Just clarity from day one